Celine-1
10 January 2011
M/V Celine-I arrived at Hamburg on 08.01.2011 to discharge bulk cargo. An expanded PSC-inspection has been carried out on 10.01.2011.The inspection revealed 52 deficiencies of which 12 were considered ground for detention.
At the re-inspection on 17.01.2011 repairs and rectification of the deficiencies were verified. The ship has been allowed to sail. Only one month later Celine-I again had been detained in the UK.
Read the full 'caught in the net' report.